Результаты поиска по книге

Другие издания - Просмотреть все

Часто встречающиеся слова и выражения

Популярные отрывки

Стр. 1561 - ... with the relative benefits received or other equitable relationship. Subject to the foregoing, a cost is allocable to a Government contract if it: (a) Is incurred specifically for the contract; (b) Benefits both the contract and other work, or both Government work and other work, and can be distributed to them in reasonable proportion to the benefits received ; or (c) Is necessary to the overall operation of the business, although a direct relationship to any particular cost objective cannot...
Стр. 1561 - Proposal costs are the costs of preparing bids or proposals on potential government and non-government research agreements or projects, including the development of engineering data and cost data necessary to support the institution's bids or proposals. Proposal costs of the current accounting period of both successful and unsuccessful bids and proposals normally...
Стр. 1547 - Research and development costs. (a) Basic research, for the purpose of this Subpart 1-15.2, is that type of research which is directed toward increase of knowledge in science. In such research, the primary aim of the investigator is a fuller knowledge or understanding of the subject under study, rather than any practical application thereof.
Стр. 1561 - Composition of total cost. The total cost of a contract is the sum of the allowable direct and indirect costs allocable to the contract, incurred or to be incurred, less any allocable credits.
Стр. 1899 - Government employees" as defined In Section 202 of Title 18 of the United States Code, who are employed in the Executive Branch. SEC. 302. A consultant, adviser or other special Government employee must refrain from any use of his public office which Is motivated by, or gives the appearance of being motivated by, the desire for private gain for himself or other persons, including particularly those with whom he has family, business, or financial ties.
Стр. 1621 - Dr. George L. Simpson, Jr., Assistant Administrator for Technology, Utilization, and Policy Planning, NASA ; accompanied by James T.
Стр. 1353 - ... Bureau-funded operational meteorological satellite system, based on the highly successful TIROS technology, will be set up to provide data for weather analyses and forecasts. This TIROS Operational Satellite (TOS) system, a cooperative NASA-Weather Bureau program, has as its primary objective obtaining cloud picture coverage of the entire sunlit portion of the earth at least once a day on a regular and continuing basis. The system, to assure maximum success at minimum cost, would use proven meteorological...
Стр. 1376 - A detailed plan that describes the project and the manner in which it is to be carried out within the scope defined by the Project Approval Document. When approved by the appropriate Program Director, the Project Development Plan becomes the primary operating document for project implementation. Content, preparation and revision of Project Development Plans are described in paragraph 8a . 5. BACKGROUND The overall NASA planning structure is summarized as follows: a. Long-Range Planning. Long-range...
Стр. 1963 - CIT'S fee for the operation of the Laboratory. The new contract contains a schedule which sets the upper and lower limits of the fee on the basis of the dollar volume of work which NASA places with CIT/JPL. The exact fee within these limits, will be determined by how well CIT/JPL performs in the management of the Laboratory.
Стр. 1391 - Ensuring that oversights and omissions in any aspect of the project are detected and corrected in time to minimize cost overruns, schedule delays, and technical failures.

Библиографические данные