INDEX Current Status of Shipyards, 1974, hearings are printed in three parts: Naval PRINCIPAL WITNESSES WHO APPEARED IN PER- Blackwell, Robert J., statement of 1187 I. Description of Maritime Administration program as it affects 1187 A. Statutory responsibility. 1187 B. Basic changes in the maritime program for the 1970's. 1188 1970's 1189 II. Impact of MarAd programs on shipyards 1192 A. Comparison of Navy and private work before and after 1192 B. Arrangements for coordination of Navy and MarAd 1193 C. Shipyard modernization and capacity expansion for 1193 D. Results of MarAd Shipyard R. & D. programs.. 1196 III. Success in achieving series production_. A. Adoption of MarAd designs and series production_. 1200 1200 1202 A. Expected number, type, size of ships to be constructed ii Blackwell, Robert J., statement of-Continued Page 1235 A. Description of current MarAd program 1235 B. Shipyards likely to participate in nuclear construction __ 1236 1236 D. Need for mobilization ship designs (updated period ically). 1237 E. Mobilization annually.. 1237 VIII. National security considerations. 1238 A. Adequacy of the U.S. merchant fleet to meet national 1238 B. Adequacy of the shipyard mobilization base_ D. National defense reserve fleet 1243 General principles What should be done?: By the Congress. By the Secretary of Defense By the Secretary of the Navy. By the shipbuilding industry. Holloway, Adm. James L., statement of Annual report on the status of shipbuilding and ship repair industry__ Construction subsidies and priorities 1537 1542 1543 1544 1539 1540 1541 1541 1541 1163 1488 1512 1520 1524 1525 1518 1517 Primary mission... Proposed 5-year shipbuilding program. Shipwork allocation to private shipyards. Shipyard capacity and capability Strategic overview_ 1488 1534 1518 1511 1488 Holloway, Adm. James L., statement of—Continued Long range planning Navy contractual procedures and administration_ Middendorf, Hon. J. William, statement of Charts: 4. Claims appeal summary Examples of shipbuilding problems and corrective action taken... Individual claims settlement/withdrawals.. NMARC members industry affiliation.. Out-of-court settlements of shipbuilding appeals. Shipbuilding claims over $1 million_. Page 1492, 1508 1501 1497 1495 1507 1469 1476 1472 1473 1478 1479 1482 1476 1484 1477 1475 1262 1291 1290 1292, 1327 1294, 1407 1292-1293 1293 1291 1298 1284 1264, 1321 1321 1264 1320 1321, 1325 1324, 1403 1264, 1326, 1328 1264, 1320 Government claim defense personnel changes Lawyers Hires female engineer.. Recommendations for improving weapons system acquisition "Role of Engineering in the Navy" Rotation of personnel: 1265 1263 1348 1296, 1356, 1403 1314 1296 1296, 1314, 1348, 1401 1315 1293 1290 Series construction__ Title VIII-Nuclear Navy. Contract negotiations with Navy Cost overruns of.. Ship construction planning. 1316 1270, 1316 1265, 1291 1299 1302 Testimony apparently derived from common source....... Shipbuilding: Five-year shipbuilding authorization program 1262 1273, 1406 1318 1262 1405 1406 1273, 1346 1405 |