direction for efforts to improve weapon surveillance and for the Science and Engineering Campaigns.

The Laboratory Director's Responsibility. As mentioned, the use of QMU helps to focus attention on aspects of weapon design and engineering that matter most to overall performance. The methodology and considerable amount of data gathered that is required for its implementation are amendable to thorough review-expert opinion and a multiplicity of viewpoints are an absolutely necessary part of the process. However, in the end, certification is a judgment issue that ultimately rests on my shoulders. It is my responsibility as laboratory director. Enhanced Surveillance

Our stockpile surveillance efforts focus on assessing the condition of weapons in the stockpile and on understanding the effect of aging on them. Aging is important because it affects the physical characteristics of materials, and we must determine how these changes impact weapon safety and performance. With a better understanding of aging, we can help to avoid surprise. More predictive stockpile surveillance makes possible systematic refurbishment and preventative maintenance activities to correct developing problems when necessary. The workload at the production facilities can be better managed if burdensome refurbishment of components that are not in danger of failing can be avoided. An important factor here is to be able to detect subtle changes to the weapon system well in advance of the change causing a safety, reliability, or performance issue. This is essential to prepare for and balance the workload for upgrades or life extension efforts that may take many years to fully implement.

We continually review and upgrade our surveillance programs as we gather more data, gain experience, and refine sampling plans. We also measure additional attributes as new tools become available and the need for more information arises. We are now taking on responsibility for surveillance of pits from Livermore-designed weapons in the stockpile to better balance the workload. These activities had been conducted at Los Alamos.

In addition, we are making major improvements to the sensors and techniques used to inspect weapons. Newly emerging diagnostics-including some that do not require destruction of the weapon are enabling us to better quantify the condition of the stockpile and to identify aging characteristics at the earliest possible time. Better surveillance capabilities can help avoid unnecessary refurbishment work at the plants. For example, Livermore, in cooperation with Y-12, has completed the development of an analytical model and the development and deployment of a suite of diagnostic tools that enable us to understand the aging behavior of secondary assemblies. We are also completing development of high-resolution x-ray tomography for imaging weapon pits; first phase deployment at the Laboratory is complete, and deployment at Pantex is continuing. Furthermore, development continues on highenergy neutron radiography for nondestructively detecting small voids and structural defects in weapon systems.

Understanding Plutonium

One of the major success stories of the Stockpile Stewardship Program is the significant improvement we are making in understanding the properties of plutonium. This is a very important issue-we need to understand aging in plutonium and the effect of aging-related changes on the performance of an imploding pit of a stockpiled weapon. The required capacity of the production complex depends on the anticipated lifetime of plutonium pits in the stockpile. An accurate assessment is necessary. If we underestimate the lifetime of pits, we may overinvest in facilities to remanufacture plutonium parts. If we overestimate the lifetime of pits, the nation could find itself critically short of capacity for plutonium operations when it is vitally needed.

To study the highly complex properties of plutonium, we have combined advances in theoretical modeling with the use of sophisticated experiments. For example, we are using advanced materials characterization tools such as our Transmission Electron Microscope, the most powerful such instrument in the NNSA complex, to study how aging plutonium accommodates the helium that is created through self-irradiation. We are also using old pits and accelerated-aging alloys to determine the lifetime of pits. Accelerated-aging samples are plutonium alloys with a mixture of isotopes to increase the rate of self-irradiation damage so that the material "ages" faster. Furthermore, Livermore is conducting sub-critical experiments at the Nevada Test Site (NTS) to investigate the properties of plutonium shocked and accelerated by high explosives. NTS is also site of the Joint Actinide Shock Physics Experimental Research (JASPER) Facility, a two-stage gas gun for performing shock tests on special nuclear materials. Now that construction is completed, JASPER will com

plement other experimental and modeling activities by providing scientists more precise equation-of-state data at extreme conditions than can be obtained from other types of experiments.

Capabilities for Weapon Assessments and Certification

Assessments of weapon performance and certification of weapon refurbishments must be based on scientific and engineering demonstration to be credible. In the absence of nuclear testing, we rely on data from past nuclear tests as a benchmark, component-level experiments and demonstration, and advanced simulations for an assessment of weapon performance and safety that is integrated through use of the QMU methodology. This approach has enabled us to successfully certify the W87 life-extension refurbishment and address stockpile issues that have emerged to date. However, as the stockpile ages, we anticipate that more difficult issues will arise. These needs to be able to assess and certify both weapon performance and refurbishment actions-drive the Stockpile Stewardship Program's investments in much more capable experimental facilities, such as the National Ignition Facility (NIF), the Dual Axis Radiographic Hydrodynamic Test Facility and even more advanced hydro-test capabilities, and greatly enhanced numerical simulation tools developed through the Advanced Simulation and Computing (ASCI) program. Here, the discussion focuses on three areas where significant improvements in capabilities are completed or under way at Livermore: the Contained Firing Facility, ASCI, and NIF. The Contained Firing Facility. Hydrodynamics testing is the most valuable experimental tool we have for diagnosing device performance issues for primaries in stockpiled weapons. Through hydrodynamics experiments conducted at Livermore's Site 300 and the Dual-Axis Radiographic Hydrodynamic Test Facility (DARHT) at Los Alamos, weapon scientists are able to characterize the energy delivered from the high explosives to a mock pit, the response of the pit to hydrodynamic shocks, and the resulting distribution of pit materials when they are highly compressed. This information is critical for baselining weapons, certifying stockpile performance, and validating hydrodynamics simulation codes.

Over the past decade, we have made tremendous advances in diagnostics capabilities and experimental techniques used in hydrodynamic testing. We are now able to gather far more revealing data from hydrodynamic tests than was possible when we developed the weapons that are now in the stockpile. The most sophisticated type of hydro experiment is the "core punch," in which scientists use high-energy radiography to record a digital image of the detailed shape of the gas cavity inside a pit when it is highly compressed. In 1998, we carried out at Livermore's Flash X-Ray Facility the first core punches on two important stockpile primary devices: the W76 SLBM warhead and the B83 strategic bomb.

An upgrade of the Flash X-Ray Facility was completed last year with the addition of the Contained Firing Facility. The project was completed on time, on budget. Qualification testing has been completed to assure its ability to contain debris from experiments that use up to 60 kilograms of high explosives. The first stockpile-related experiment was executed in March 2002. Livermore is now able to conduct these critically important experiments with isolation from the surrounding environment. ASCI and the ASCI White Computer. The Advanced Simulation and Computing (ASCI) program is central to many of the success stories of the Stockpile Stewardship Program. ASCI has steadily progressed from efforts to develop weapons physics and engineering codes that run efficiently on the new computers to a resource that the LEPS are counting on to meet important milestones. As we continue to get larger and faster machines and better simulation models, the ASCI capabilities we have are "deployed" in support of a wide range of Stockpile Stewardship Program deliverables.

In summer 2000, we took delivery from IBM of ASCI White, at the time the world's most powerful computer, capable of 12.3 teraops (trillion operations per second). This machine has been successfully used and shared since early 2001 by all three NNSA laboratories-Sandia and Los Alamos were extremely effective in using it by computing at a distance. To meet each laboratory's requirements to run problems, calculations were interleaved in an integration schedule for the machine. Both Livermore and Lost Alamos used ASCI White to complete in late 2001 the first-ever prototype fully three-dimensional simulations of a complete warhead explosion. The size and scale of ASCI White allowed the two laboratories to employ a level of spatial resolution and depth of physics models that were heretofore completely beyond reach in 3D. Sandia also used ASCI White to perform structural dynamics calculations for different environments that weapons might encounter. One terabyte of core memory was used on each structural dynamics calculation in simulations that were completed in late September 2001 and set many world records.

The speed, large memory, and stability of White were essential elements contributing to these successful series of calculations.

ASCI White is more than fully subscribed, and new capabilities are soon to be delivered to Los Alamos and Sandia. Livermore is earmarked to take delivery of its next ASCI computer in FY 2004, a machine that will be capable of 60 to 100 teraops. It will move us much closer to ASCI's goal of full-scale simulation of weapons performance using advanced physics models with data derived from extensive, first-principles physics simulations. The groundbreaking ceremony for construction of the Terascale Šimulation Facility (TSF) to house this computer was held April 4, 2002.

The National Ignition Facility (NIF). The High Energy Density Physics (HEDP) effort is a critical element of the Stockpile Stewardship Program. It is the source of experimental data to support ongoing LEPS and data to support the longer-term effort to provide predictive capability and quantitative measures for warhead certification into the future. The National Ignition Facility (NIF) is the central experimental facility in the HEDP Program. Housing a 192-beam laser and associated experimental capabilities, NIF will be the world's largest laser, delivering 60 times more energy density than the Omega laser at the University of Rochester (and the previous Nova laser at Livermore), currently the largest in the HEDP program.

NIF is the only stewardship facility that will provide experimental conditions relevant to fusion burn, a critical process in the operation of a nuclear weapon. NIF will be capable of addressing underlying physics issues associated with our stockpile weapons, and the ability to conduct integrated experiments at weapons-relevant temperatures and pressures. These integrated NIF experiments will allow us to experimentally validate our computational capabilities, under conditions more closely matched to those encountered in actual underground tests. In addition, NIF will be an important tool for evaluating the judgment of the stewards, based on the ability to predict, or not, the outcome of complex weapons-relevant experiments.

Construction is continuing on NIF. Overall the NIF project is more than 60% complete. In September 2001 the NIF conventional facilities construction, a $270 million project, was completed on schedule and on budget. In May 2002, the Project completed installation of one-half of NIF's beampath infrastructure. Now in place are the precision-cleaned enclosures for the components of 96 laser beams. In addition, we continue to make outstanding technical progress on NIF's optical systems. Great progress has been made on the development of new optics polishing techniques that can reduce the damage potential of NIF optics much more than our requirements. We are currently implementing these new techniques at our vendors to provide the first optics for NIF's final focusing systems.

The baseline plan and schedule for NIF was included in General Gordon's certification of the NIF project, provided to Congress on April 6, 2001. The schedule provides for project completion at the end of FY 2008, and the NIF team's goal in the coming year is to achieve “first light” by delivering four laser beams to the target chamber. Experimental plans have been developed to utilize the NIF as it is brought on line. These early experiments have been designed to provide data to support LEP activities and to begin to provide some of the data required to improve our ability to determine margins against credible failure modes. As commissioning of laser beams continues, NIF will quickly become the workhorse experimental facility in the HEDP program.

PROGRAM CHALLENGES

Many major milestones have been achieved in the Stockpile Stewardship Program, but difficult challenges lie ahead as weapons continue to age and the possibility of new requirements for stockpiled weapons arise. A full spectrum of capabilities for stockpile stewardship is required for long-term success.

First, to recognize and evaluate aging issues (and other defects) in weapons and devise remedies before they become problems, we must understand in detail the science and technology that govern all aspects of nuclear weapons. We are making progress here, but we need even better investigative tools. Enhanced surveillance capabilities and a better understanding of aging effects in weapon components will help to avoid surprise and provide a longer lead to time for refurbishment actions. The nuclear weapons production complex must be flexible and able to remanufacture parts and refurbish weapons as needed. There will be requirements for new weapon components. Investments in production facilities are required to support urgently needed refurbishment actions in current LEPs and to begin to deal with widespread obsolescence in the production complex. The plants need efficient and modern means for manufacturing weapon components. In addition, we need to pro

ceed expeditiously with studies of plutonium aging and the W88 Pit Manufacturing and Certification Integrated Project. These efforts will provide an informed basis for future decisions about a plutonium pit production capability.

We also must be responsive to new requirements and prepared to deal with surprises. DoD requires that NNSA retain the capability to design, develop, and produce new-design nuclear warheads. By engaging in studies and exploratory research and development for advanced weapon concepts, we can exercise weapon development capabilities, help to avoid surprise and understand threats, and become better positioned to respond to new weapon requirements should they emerge. In addition, these activities will serve to train new designers and engineers, and they will reinforce ties to DoD and its contractors. Interactions with the plants about manufacturing issues will also be beneficial.

Since the future is uncertain and surprises do occur, we need nuclear-test readiness. In conjunction with the other laboratories and the Nevada Test Site, Livermore is participating in NNSA's examination of measures that can be taken_to shorten the time between a decision to conduct a nuclear test and the event. Together, we need to determine the longest lead-time items and costs to shorten them in order to make reasonable trade-off decisions to cost-consciously improve readi

ness.

The nation must be confident in the results of Annual Certification and our assessments of the performance of aging and refurbished warheads as well as any new weapons that are developed. Expert judgment is required, backed by experimental data, the results of validated simulation models, and application of a rigorous, quantitative certification methodology. We need to press ahead to further refine and fully implement the QMU certification methodology together with acquisition of advanced computation and experimental facilities: more powerful ASCI computers, modern laboratory experimental facilities, NIF and DARHT, and then an advanced hydrotest facility. These capabilities are essential elements of the Stockpile Stewardship Program's Campaigns and efforts to improve our fundamental understanding of nuclear weapons, which are essential for assessments and certification. Finally, acquisition of this spectrum of capabilities is time urgent to meet existing requirements for weapon refurbishment and to deal with other weapon performance issues as they arise. At the same time, the LEP workload is substantial, and the program needs to become more flexible and agile so that it will be able to deal with surprises, which are sure to come. There are currently many competing demands on the Stockpile Stewardship Program that must be balanced in order to succeed. Program balance depends on having strong, sustained support for the Stockpile Stewardship Program, and we are benefiting from this committee's continuing support. Program balance also depends on having quality leadership by the NNSA management team, effective systems and tools for comprehensive program planning, and efficient program execution. We are pleased with General Gordon's actions to provide NNSA clear direction, make necessary organizational changes, improve longterm planning and budgeting, and make NNSA a more effective and efficient organization. We are already seeing some benefits from these actions and expect to see more in coming years.

CLOSING REMARKS

The Stockpile Stewardship Program continues to make excellent technical progress in many areas, some of which I have highlighted here: notably, the W87 ICBM warhead life extension, completion of the Contained Firing Facility, progress on construction of the National Ignition Facility, use of the ASCI White supercomputer and future ASCI plans at Livermore, and selected scientific and technical achievements that are improving our understanding of the aging of nuclear weapons and weapon performance. However, many difficult challenges lie ahead. There are many competing demands on the program that must be balanced in order to succeed. Stockpile stewardship continues to be an ambitious, extremely demanding program from both technical and managerial perspectives. Nevertheless, I believe that a strong, sustained Stockpile Stewardship Program will succeed in maintaining the safety, security, and reliability of the nation's nuclear deterrent over the long term. Achieving that goal depends on your strong, sustained support for the program, effective and efficient management of it by NNSA, flexible and agile production capabilities, and continuing scientific and technical excellence in pursuit of stockpile stewardship at the NNŠA laboratories.

Finally, as you are aware, I will be leaving my position as laboratory director soon. I appreciate the support that this committee has provided to Lawrence Livermore and to me during my tenure. I also appreciate having had the opportunity to

serve our nation in this manner. I look forward to the very positive future that I believe Lawrence Livermore will have with your continued support.

STATEMENT OF DENNIS R. RUDDY

PRESIDENT AND GENERAL MANAGER, BWXT PANTEX
BEFORE THE

SUBCOMMITTEE ON MILITARY PROCUREMENT
COMMITTEE ON ARMED SERVICES

U.S. HOUSE OF REPRESENTATIVES

JUNE 12, 2002

Mr. Chairman, my name is Dennis Ruddy. I am President and General Manager of BWXT Pantex, which manages the National Nuclear Security Administration's (NNSA) Pantex Plant near Amarillo, Texas.

Since BWXT Pantex assumed operations of the plant a little more than a year ago, we have made significant progress in fulfilling the site's important national security missions:

• Evaluate, retrofit and repair weapons in support of both life extension programs and certification of weapon safety and reliability;

• Dismantle weapons that are surplus to the strategic stockpile;

• Sanitize components from dismantled weapons;

• Develop, test and fabricate chemical and explosive components; and • Provide interim storage and surveillance of plutonium components.

BWXT Pantex is preparing to accomplish future work that will provide a safe and reliable nuclear weapons stockpile for many years to come. That preparation involves improving our infrastructure and technology within a new security environment to ensure our ability to meet Stockpile Life Extension Program (SLEP) objectives.

I believe we all recognize the challenge of providing for the security of our facilities and our personnel in the wake of the events of September 11, 2001. Immediately after the tragic events of that day, we implemented a contingency plan to ensure the security of the site and our personnel. Since that time, we have enhanced security in a wide variety of areas. We increased security patrols around the site, tightened our requirements to access the facility, improved our physical security systems and replaced equipment that was beginning to show its age. While our workforce, and particularly our security force, has responded admirably, these enhancements have not come without costs. This fiscal year, more than $16 million in supplemental funding has been given to Pantex to cover these expenses. This amount is over and above the $68 million originally earmarked for Pantex security. Much of this funding has been used to cover overtime for our security force. Before September 11, our security guards normally worked 12 hours a day, on four consecutive days. Then, they had four days off. Since September 11, they have worked six consecutive 12-hour days, then been given two days off. In order to meet the NNSA's new security requirements, reduce our overtime, and put our guards back on a more reasonable work schedule, we established a target to hire 140 additional security officers by the end of this fiscal year. Through operational efficiencies and other security enhancements, we are seeking to reduce this new staffing to 109 additional officers. Either number will be a significant increase in security personnel compared to our staffing before the terrorist attacks. In addition to personnel additions, we are currently considering other security enhancements and their associated costs. In order to develop these security improvements and retain our new personnel, permanent increases in security funding with have to be made a priority. Despite the increased attention that we have given to security, our mission to support Stockpile Stewardship remains our primary focus. The Nation still depends on a reliable nuclear deterrent to protect our country and our allies, and BWXT Pantex is committed to safely providing weapons of the highest quality to our customer. As we look ahead, we see that the majority of our authorized weapons dismantlement workload is scheduled to be complete by 2008. It should be noted that the recent arms reduction agreement between the United States and Russia has not been factored into this schedule. Our weapons evaluation workload remains steady for the future. Beginning in 2005, we are planning for a surge in work to support SLEP effort. The additional SLEP workload will involve modifications to weapon systems and will bring with it additional evaluation requirements.